Mississippi Power IC-1031 (IC-1031)

Mississippi Power IC-1031 is a 150.0 MW solar interconnection project in Jasper County, Mississippi with a current status of withdrawn. It is proposed to connect at Jasper East SS Substation 230 kV Bus.

150.0 MWCapacity
WithdrawnStatus
MSMarket
SolarTechnology

Project facts

Canonical nameMississippi Power IC-1031
Queue IDIC-1031
Statuswithdrawn
Source statusGIA Terminated
MarketMS
TechnologySolar
Capacity150.0 MW
StateMississippi
CountyJasper County
Point of interconnectionJasper East SS Substation 230 kV Bus
Requested (queue) date2022-03-11
Proposed in-service date2025-08-24
Operational date
Withdrawn date
Developer
Utility / transmission ownerMississippi Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata