Mississippi Power IC-1205 (IC-1205)

Mississippi Power IC-1205 is a 200.0 MW solar interconnection project in Jasper County, Mississippi with a current status of withdrawn. It is proposed to connect at Jasper East - Enterprise 230 kV Line.

200.0 MWCapacity
WithdrawnStatus
MSMarket
SolarTechnology

Project facts

Canonical nameMississippi Power IC-1205
Queue IDIC-1205
Statuswithdrawn
Source statusRequest Withdrawn
MarketMS
TechnologySolar
Capacity200.0 MW
StateMississippi
CountyJasper County
Point of interconnectionJasper East - Enterprise 230 kV Line
Requested (queue) date2023-11-28
Proposed in-service date2027-04-20
Operational date
Withdrawn date
Developer
Utility / transmission ownerMississippi Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata