Mississippi Power IC-127 (IC-127)

Mississippi Power IC-127 is a 320.0 MW gas interconnection project in Jones County, Mississippi with a current status of withdrawn. It is proposed to connect at S.Hattiesburg 115 kV Line.

320.0 MWCapacity
WithdrawnStatus
MSMarket
GasTechnology

Project facts

Canonical nameMississippi Power IC-127
Queue IDIC-127
Statuswithdrawn
Source status—
MarketMS
TechnologyGas
Capacity320.0 MW
StateMississippi
CountyJones County
Point of interconnectionS.Hattiesburg 115 kV Line
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2001-12-28
Developer—
Utility / transmission ownerMississippi Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-12

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.