Mississippi Power IC-235 is a 592.0 MW gas interconnection project in Kemper County, Mississippi with a current status of operational. It is proposed to connect at Meridian NE - Greene County 230 kV Line.

592.0 MWCapacity
OperationalStatus
MSMarket
GasTechnology

Project facts

Canonical nameMississippi Power IC-235
Queue IDIC-235
Statusoperational
Source statusCommercial Operation
MarketMS
TechnologyGas
Capacity592.0 MW
StateMississippi
CountyKemper County
Point of interconnectionMeridian NE - Greene County 230 kV Line
Requested (queue) date2010-02-23
Proposed in-service date2012-08-11
Operational date2012-08-11
Withdrawn date
Developer
Utility / transmission ownerMississippi Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata