Mississippi Power IC-486 (IC-486)

Mississippi Power IC-486 is a 100.0 MW solar interconnection project in Scott County, Mississippi with a current status of withdrawn. It is proposed to connect at Newton - Forest Industrial 115 kV Line.

100.0 MWCapacity
WithdrawnStatus
MSMarket
SolarTechnology

Project facts

Canonical nameMississippi Power IC-486
Queue IDIC-486
Statuswithdrawn
Source statusRequest Withdrawn
MarketMS
TechnologySolar
Capacity100.0 MW
StateMississippi
CountyScott County
Point of interconnectionNewton - Forest Industrial 115 kV Line
Requested (queue) date2016-08-23
Proposed in-service date2018-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerMississippi Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata