Mississippi Power MPCQF-1179 (MPCQF-1179)
Mississippi Power MPCQF-1179 is a 80.0 MW solar interconnection project in Jasper County, Mississippi with a current status of withdrawn. It is proposed to connect at Jasper East SS Substation 230 kV Bus.
80.0 MWCapacity
WithdrawnStatus
MSMarket
SolarTechnology
Project facts
| Canonical name | Mississippi Power MPCQF-1179 |
|---|---|
| Queue ID | MPCQF-1179 |
| Status | withdrawn |
| Source status | Request Withdrawn |
| Market | MS |
| Technology | Solar |
| Capacity | 80.0 MW |
| State | Mississippi |
| County | Jasper County |
| Point of interconnection | Jasper East SS Substation 230 kV Bus |
| Requested (queue) date | 2023-10-03 |
| Proposed in-service date | 2029-07-02 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Mississippi Power Co |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.