Mississippi Power MPCQF-451 (MPCQF-451)

Mississippi Power MPCQF-451 is a 78.5 MW solar interconnection project in Clarke County, Mississippi with a current status of operational. It is proposed to connect at Laurel North Amaranth St.- Pachuta 115kV Line.

78.5 MWCapacity
OperationalStatus
MSMarket
SolarTechnology

Project facts

Canonical nameMississippi Power MPCQF-451
Queue IDMPCQF-451
Statusoperational
Source statusCommercial Operation
MarketMS
TechnologySolar
Capacity78.5 MW
StateMississippi
CountyClarke County
Point of interconnectionLaurel North Amaranth St.- Pachuta 115kV Line
Requested (queue) date2020-10-16
Proposed in-service date2023-03-01
Operational date2023-03-01
Withdrawn date
Developer
Utility / transmission ownerMississippi Power Co

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata