Mist Tap Load Growth (L0656)
Mist Tap Load Growth is a 3.5 MW other interconnection project with a current status of operational. It is proposed to connect at Allston-Driscoll No. 2 115 kV line.
3.5 MWCapacity
OperationalStatus
—Market
OtherTechnology
Project facts
| Canonical name | Mist Tap Load Growth |
|---|---|
| Queue ID | L0656 |
| Status | operational |
| Source status | BPA COMPLETED |
| Market | — |
| Technology | Other |
| Capacity | 3.5 MW |
| State | — |
| County | Columbia |
| Point of interconnection | Allston-Driscoll No. 2 115 kV line |
| Requested (queue) date | 2025-07-01 |
| Proposed in-service date | — |
| Operational date | 2027-06-01 |
| Withdrawn date | — |
| Developer | West Electric LLC |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata