MITCHELL COUNTY (ITCM) - HAZLETON (ITCM) 345.0kV is a 155.0 MW wind interconnection project in Howard, Iowa with a current status of operational. It is proposed to connect at MITCHELL COUNTY (ITCM) - HAZLETON (ITCM) 345.0kV.

155.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameMITCHELL COUNTY (ITCM) - HAZLETON (ITCM) 345.0kV
Queue IDJ3898
Statusoperational
Source statusActive
Market
TechnologyWind
Capacity155.0 MW
StateIowa
CountyHoward
Point of interconnectionMITCHELL COUNTY (ITCM) - HAZLETON (ITCM) 345.0kV
Requested (queue) date2025-02-14
Proposed in-service date2030-05-01
Operational date2030-05-01
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata