MO Queue Project GI-111 — Wind in Douglas County, Mo And Wright County, Missouri

MO Queue Project GI-111 — Wind in Douglas County, Mo And Wright County, Missouri is a 150.0 MW wind interconnection project in Douglas County, Mo And Wright County, Missouri with a current status of withdrawn. It is proposed to connect at Mansfield-Gainesville 161 kV line.

150.0 MWCapacity
WithdrawnStatus
MOMarket
WindTechnology

Project facts

Canonical nameMO Queue Project GI-111 — Wind in Douglas County, Mo And Wright County, Missouri
Queue IDGI-111
Statuswithdrawn
Source statusWithdrawn
MarketMO
TechnologyWind
Capacity150.0 MW
StateMissouri
CountyDouglas County, Mo And Wright County
Point of interconnectionMansfield-Gainesville 161 kV line
Requested (queue) date2022-11-22
Proposed in-service date2026-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerAssociated Electric Cooperative, Inc.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: aeci-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata