MO Queue Project GI-115 — Solar in Caldwell County, Missouri is a 35.0 MW solar interconnection project in Caldwell County, Missouri with a current status of withdrawn. It is proposed to connect at Nettleton 69 kV.

35.0 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology

Project facts

Canonical nameMO Queue Project GI-115 — Solar in Caldwell County, Missouri
Queue IDGI-115
Statuswithdrawn
Source statusWithdrawn
MarketMO
TechnologySolar
Capacity35.0 MW
StateMissouri
CountyCaldwell County
Point of interconnectionNettleton 69 kV
Requested (queue) date2023-02-23
Proposed in-service date2025-05-28
Operational date
Withdrawn date
Developer
Utility / transmission ownerAssociated Electric Cooperative, Inc.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: aeci-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata