MO Queue Project GI-46 — Wind in Sullivan County, Missouri

MO Queue Project GI-46 — Wind in Sullivan County, Missouri is a 88.8 MW wind interconnection project in Sullivan County, Missouri with a current status of withdrawn. It is proposed to connect at Hickory Creek to Locust Creek 161 kV Line.

88.8 MWCapacity
WithdrawnStatus
MOMarket
WindTechnology

Project facts

Canonical nameMO Queue Project GI-46 — Wind in Sullivan County, Missouri
Queue IDGI-46
Statuswithdrawn
Source statusWithdrawn
MarketMO
TechnologyWind
Capacity88.8 MW
StateMissouri
CountySullivan County
Point of interconnectionHickory Creek to Locust Creek 161 kV Line
Requested (queue) date2011-03-03
Proposed in-service date2013-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerAssociated Electric Cooperative, Inc.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: aeci-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata