MO Queue Project GI-67 — Wind in Nodaway County, Missouri

MO Queue Project GI-67 — Wind in Nodaway County, Missouri is a 250.0 MW wind interconnection project in Nodaway County, Missouri with a current status of withdrawn. It is proposed to connect at Cooper to Fairport 345 kV.

250.0 MWCapacity
WithdrawnStatus
MOMarket
WindTechnology

Project facts

Canonical nameMO Queue Project GI-67 — Wind in Nodaway County, Missouri
Queue IDGI-67
Statuswithdrawn
Source statusWithdrawn
MarketMO
TechnologyWind
Capacity250.0 MW
StateMissouri
CountyNodaway County
Point of interconnectionCooper to Fairport 345 kV
Requested (queue) date2018-03-08
Proposed in-service date2020-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerAssociated Electric Cooperative, Inc.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: aeci-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.