MO Queue Project GI-74 — Solar in New Madrid County, Missouri
MO Queue Project GI-74 — Solar in New Madrid County, Missouri is a 300.0 MW solar interconnection project in New Madrid County, Missouri with a current status of withdrawn. It is proposed to connect at New Madrid to Essex 345 kV.
300.0 MWCapacity
WithdrawnStatus
MOMarket
SolarTechnology
Project facts
| Canonical name | MO Queue Project GI-74 — Solar in New Madrid County, Missouri |
|---|---|
| Queue ID | GI-74 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | MO |
| Technology | Solar |
| Capacity | 300.0 MW |
| State | Missouri |
| County | New Madrid County |
| Point of interconnection | New Madrid to Essex 345 kV |
| Requested (queue) date | 2018-12-06 |
| Proposed in-service date | 2021-10-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Associated Electric Cooperative, Inc. |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: aeci-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.