Mohave Electric at Fort Mohave is a 4.4 MW solar interconnection project in Mohave, Arizona with a current status of operational.

4.4 MWCapacity
OperationalStatus
WALCMarket
SolarTechnology

Project facts

Canonical nameMohave Electric at Fort Mohave
Queue ID59819_PV1
Statusoperational
Source status(OP) Operating
MarketWALC
TechnologySolar
Capacity4.4 MW
StateArizona
CountyMohave
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2015-04-01
Withdrawn date—
Developer—
Utility / transmission ownerMohave Electric Cooperative, Inc.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.