MOLER - COLFEL 230.0kV (S1142)

MOLER - COLFEL 230.0kV is a 300.0 MW battery interconnection project in East Feliciana, Louisiana with a current status of operational. It is proposed to connect at MOLER - COLFEL 230.0kV.

300.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameMOLER - COLFEL 230.0kV
Queue IDS1142
Statusoperational
Source statusActive
Market
TechnologyBattery
Capacity300.0 MW
StateLouisiana
CountyEast Feliciana
Point of interconnectionMOLER - COLFEL 230.0kV
Requested (queue) date2026-01-30
Proposed in-service date2027-08-20
Operational date2027-08-20
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata