Monette-Flint Creek 345 kV (GEN-2020-053)

Monette-Flint Creek 345 kV is a 240.0 MW wind interconnection project in Newton Co, Missouri with a current status of withdrawn. It is proposed to connect at Monette-Flint Creek 345 kV.

240.0 MWCapacity
WithdrawnStatus
MOMarket
WindTechnology

Project facts

Canonical nameMonette-Flint Creek 345 kV
Queue IDGEN-2020-053
Statuswithdrawn
Source statusWITHDRAWN
MarketMO
TechnologyWind
Capacity240.0 MW
StateMissouri
CountyNewton Co
Point of interconnectionMonette-Flint Creek 345 kV
Requested (queue) date2020-04-29
Proposed in-service date2023-12-15
Operational date
Withdrawn date2022-08-25
Developer
Utility / transmission ownerEDE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata