Monkton (AB2-184)

Monkton is a 5.0 MW solar interconnection project in Baltimore County, Maryland with a current status of withdrawn.

5.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameMonkton
Queue IDAB2-184
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity5.0 MW
StateMaryland
CountyBaltimore County
Point of interconnection—
Requested (queue) date2016-04-29
Proposed in-service date2017-06-30
Operational date—
Withdrawn date2016-05-19
Developer—
Utility / transmission ownerBGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata