Montanore Mine (L0215)
Montanore Mine is a 26.0 MW other interconnection project in Lincoln, Montana with a current status of withdrawn. It is proposed to connect at Libby-Noxon 230.
26.0 MWCapacity
WithdrawnStatus
MTMarket
OtherTechnology
Project facts
| Canonical name | Montanore Mine |
|---|---|
| Queue ID | L0215 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | MT |
| Technology | Other |
| Capacity | 26.0 MW |
| State | Montana |
| County | Lincoln |
| Point of interconnection | Libby-Noxon 230 |
| Requested (queue) date | 2005-08-23 |
| Proposed in-service date | 2007-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | Flathead Electric Cooperative, Inc. |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata