Montgomery- Callaway- 7 (J1836)

Montgomery- Callaway- 7 is a 300.0 MW solar interconnection project in Callaway, Missouri with a current status of operational. It is proposed to connect at Montgomery- Callaway- 7.

300.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameMontgomery- Callaway- 7
Queue IDJ1836
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity300.0 MW
StateMissouri
CountyCallaway
Point of interconnectionMontgomery- Callaway- 7
Requested (queue) date2020-06-23
Proposed in-service date2025-08-01
Operational date2025-08-01
Withdrawn date
Developer
Utility / transmission ownerAmeren Missouri

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.