Montour 230 kV (AF1-311)

Montour 230 kV is a 150.0 MW solar interconnection project in Montour, Pennsylvania with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameMontour 230 kV
Queue IDAF1-311
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity150.0 MW
StatePennsylvania
CountyMontour
Point of interconnection—
Requested (queue) date2019-09-30
Proposed in-service date2022-09-30
Operational date—
Withdrawn date2023-10-16
Developer—
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.