Montour 230 kV (AF2-332)

Montour 230 kV is a 50.0 MW solar interconnection project in Montour, Pennsylvania with a current status of withdrawn.

50.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMontour 230 kV
Queue IDAF2-332
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity50.0 MW
StatePennsylvania
CountyMontour
Point of interconnection
Requested (queue) date2020-03-30
Proposed in-service date2023-12-31
Operational date
Withdrawn date2025-03-28
Developer
Utility / transmission ownerPPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata