Moore Road Substation 138kV (J1555)

Moore Road Substation 138kV is a 100.0 MW solar interconnection project in Hillsdale, Michigan with a current status of withdrawn. It is proposed to connect at Moore Road Substation 138kV.

100.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMoore Road Substation 138kV
Queue IDJ1555
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity100.0 MW
StateMichigan
CountyHillsdale
Point of interconnectionMoore Road Substation 138kV
Requested (queue) date2020-06-24
Proposed in-service date2023-09-15
Operational date2023-09-15
Withdrawn date2020-11-24
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata