Moore Station Uprate (602)

Moore Station Uprate is a 4.6 MW other interconnection project in Grafton, New Hampshire with a current status of operational. It is proposed to connect at NGRID at Moore power station switchyard 230kV.

4.6 MWCapacity
OperationalStatus
NHMarket
OtherTechnology

Project facts

Canonical nameMoore Station Uprate
Queue ID602
Statusoperational
Source statusC
MarketNH
TechnologyOther
Capacity4.6 MW
StateNew Hampshire
CountyGrafton
Point of interconnectionNGRID at Moore power station switchyard 230kV
Requested (queue) date2016-04-14
Proposed in-service date
Operational date2023-10-18
Withdrawn date
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.