Mooreland 138 kV (GEN-2022-048)

Mooreland 138 kV is a 250.0 MW wind interconnection project in Woodward, Oklahoma with a current status of withdrawn. It is proposed to connect at Mooreland 138 kV.

250.0 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameMooreland 138 kV
Queue IDGEN-2022-048
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity250.0 MW
StateOklahoma
CountyWoodward
Point of interconnectionMooreland 138 kV
Requested (queue) date2022-06-23
Proposed in-service date2025-12-31
Operational date
Withdrawn date2025-03-06
Developer
Utility / transmission ownerWFEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.