Moose Creek 1 (1650)

Moose Creek 1 is a 130.0 MW battery interconnection project in Lewis, New York with a current status of withdrawn. It is proposed to connect at Boonville Substation 115 kV.

130.0 MWCapacity
WithdrawnStatus
EMarket
BatteryTechnology

Project facts

Canonical nameMoose Creek 1
Queue ID1650
Statuswithdrawn
Source status0
MarketE
TechnologyBattery
Capacity130.0 MW
StateNew York
CountyLewis
Point of interconnectionBoonville Substation 115 kV
Requested (queue) date2023-12-12
Proposed in-service date2024-03-31
Operational date
Withdrawn date
DeveloperEmeren US, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.