Morocco 345 kV Substation (J1226)

Morocco 345 kV Substation is a 200.0 MW solar interconnection project in Lenawee County, Michigan with a current status of operational. It is proposed to connect at Morocco 345 kV Substation.

200.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameMorocco 345 kV Substation
Queue IDJ1226
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity200.0 MW
StateMichigan
CountyLenawee County
Point of interconnectionMorocco 345 kV Substation
Requested (queue) date2019-04-27
Proposed in-service date2023-09-29
Operational date2023-09-29
Withdrawn date
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.