MS Queue Project 25RSC-013 — Battery in Lowndes, Mississippi

MS Queue Project 25RSC-013 — Battery in Lowndes, Mississippi is a 200.0 MW battery interconnection project in Lowndes, Mississippi with a current status of active. It is proposed to connect at LOWNDES, MS 500KV SUBSTATION.

200.0 MWCapacity
ActiveStatus
MSMarket
BatteryTechnology

Project facts

Canonical nameMS Queue Project 25RSC-013 — Battery in Lowndes, Mississippi
Queue ID25RSC-013
Statusactive
Source statusCluster Study
MarketMS
TechnologyBattery
Capacity200.0 MW
StateMississippi
CountyLowndes
Point of interconnectionLOWNDES, MS 500KV SUBSTATION
Requested (queue) date2025-08-01
Proposed in-service date2031-08-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerTennessee Valley Authority

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-09-14
Page data generated2026-11-26

Provenance: tva-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata