MT Queue Project 401 — Wind in Musselshell County, Montana

MT Queue Project 401 — Wind in Musselshell County, Montana is a 70.0 MW wind interconnection project in Musselshell County, Montana with a current status of withdrawn. It is proposed to connect at 100kV Roundup Substation.

70.0 MWCapacity
WithdrawnStatus
MTMarket
WindTechnology

Project facts

Canonical nameMT Queue Project 401 — Wind in Musselshell County, Montana
Queue ID401
Statuswithdrawn
Source statusWithdrawn
MarketMT
TechnologyWind
Capacity70.0 MW
StateMontana
CountyMusselshell County
Point of interconnection100kV Roundup Substation
Requested (queue) date2021-01-15
Proposed in-service date2023-11-15
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerNorthWestern Energy

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: northwestern-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata