MT Queue Project 97 — Wind in Rosebud And Treasure Counties, Montana

MT Queue Project 97 — Wind in Rosebud And Treasure Counties, Montana is a 300.0 MW wind interconnection project in Rosebud And Treasure Counties, Montana with a current status of withdrawn. It is proposed to connect at Colstrip Substation 500kV.

300.0 MWCapacity
WithdrawnStatus
MTMarket
WindTechnology

Project facts

Canonical nameMT Queue Project 97 — Wind in Rosebud And Treasure Counties, Montana
Queue ID97
Statuswithdrawn
Source statusWithdrawn
MarketMT
TechnologyWind
Capacity300.0 MW
StateMontana
CountyRosebud And Treasure Counties
Point of interconnectionColstrip Substation 500kV
Requested (queue) date2021-01-20
Proposed in-service date2034-12-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerPuget Sound Energy

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: pse-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata