Mt. Hermon 69 kV (AH2-198)

Mt. Hermon 69 kV is a 74.7 MW solar interconnection project in Wicomico, Maryland with a current status of withdrawn.

74.7 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameMt. Hermon 69 kV
Queue IDAH2-198
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity74.7 MW
StateMaryland
CountyWicomico
Point of interconnection
Requested (queue) date2022-03-08
Proposed in-service date2026-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-28

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.