Mt. Olive 69kV (U3-003)

Mt. Olive 69kV is a 2.0 MW gas interconnection project in Worcester, Maryland with a current status of withdrawn.

2.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameMt. Olive 69kV
Queue IDU3-003
Statuswithdrawn
Source statusDeactivated
Market
TechnologyGas
Capacity2.0 MW
StateMaryland
CountyWorcester
Point of interconnection
Requested (queue) date2008-08-14
Proposed in-service date2012-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata