Mulberry Energy Storage (1442)

Mulberry Energy Storage is a 130.0 MW battery interconnection project in Saratoga, New York with a current status of withdrawn. It is proposed to connect at Luther Forest - Eastover Road #308 115kV line.

130.0 MWCapacity
WithdrawnStatus
FMarket
BatteryTechnology

Project facts

Canonical nameMulberry Energy Storage
Queue ID1442
Statuswithdrawn
Source status0
MarketF
TechnologyBattery
Capacity130.0 MW
StateNew York
CountySaratoga
Point of interconnectionLuther Forest - Eastover Road #308 115kV line
Requested (queue) date2022-09-28
Proposed in-service date2024-04-30
Operational date
Withdrawn date
DeveloperMulberry Energy Storage 1, LLC
Utility / transmission ownerNM-NG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata