MURPHY (J3438)

MURPHY is a 250.0 MW battery interconnection project in Saginaw, Michigan with a current status of operational. It is proposed to connect at MURPHY.

250.0 MWCapacity
OperationalStatus
Market
BatteryTechnology

Project facts

Canonical nameMURPHY
Queue IDJ3438
Statusoperational
Source statusPending Revision Approval
Market
TechnologyBattery
Capacity250.0 MW
StateMichigan
CountySaginaw
Point of interconnectionMURPHY
Requested (queue) date2024-03-26
Proposed in-service date2028-06-30
Operational date2028-06-30
Withdrawn date
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.