National Grid DG 278912 (278912)

National Grid DG 278912 is a 2.2 MW solar interconnection project in Lewis, New York with a current status of operational. It is proposed to connect at LOWVILLE 773 / 36_23_77351.

2.2 MWCapacity
OperationalStatus
LowvilleMarket
SolarTechnology

Project facts

Canonical nameNational Grid DG 278912
Queue ID278912
Statusoperational
Source statusInterconnected
MarketLowville
TechnologySolar
Capacity2.2 MW
StateNew York
CountyLewis
Point of interconnectionLOWVILLE 773 / 36_23_77351
Requested (queue) date
Proposed in-service date
Operational date2025-04-04
Withdrawn date
Developer
Utility / transmission ownerNational Grid

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata