National Grid DG 278912 (278912)
National Grid DG 278912 is a 2.2 MW solar interconnection project in Lewis, New York with a current status of operational. It is proposed to connect at LOWVILLE 773 / 36_23_77351.
2.2 MWCapacity
OperationalStatus
LowvilleMarket
SolarTechnology
Project facts
| Canonical name | National Grid DG 278912 |
|---|---|
| Queue ID | 278912 |
| Status | operational |
| Source status | Interconnected |
| Market | Lowville |
| Technology | Solar |
| Capacity | 2.2 MW |
| State | New York |
| County | Lewis |
| Point of interconnection | LOWVILLE 773 / 36_23_77351 |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2025-04-04 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | National Grid |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-05 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27
Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.