National Grid DG 292086 (292086)

National Grid DG 292086 is a 4.2 MW solar interconnection project in Franklin, New York with a current status of operational. It is proposed to connect at FORT COVINGTON 896 / 36_27_89642.

4.2 MWCapacity
OperationalStatus
Fort CovingtonMarket
SolarTechnology

Project facts

Canonical nameNational Grid DG 292086
Queue ID292086
Statusoperational
Source statusInterconnected
MarketFort Covington
TechnologySolar
Capacity4.2 MW
StateNew York
CountyFranklin
Point of interconnectionFORT COVINGTON 896 / 36_27_89642
Requested (queue) date
Proposed in-service date
Operational date2025-06-27
Withdrawn date
Developer
Utility / transmission ownerNational Grid

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata