National Grid DG 321660 (321660)

National Grid DG 321660 is a 4.4 MW solar interconnection project in Chautauqua, New York with a current status of operational. It is proposed to connect at DUNKIRK-HARTFIELD #852.

4.4 MWCapacity
OperationalStatus
StocktonMarket
SolarTechnology

Project facts

Canonical nameNational Grid DG 321660
Queue ID321660
Statusoperational
Source statusInterconnected
MarketStockton
TechnologySolar
Capacity4.4 MW
StateNew York
CountyChautauqua
Point of interconnectionDUNKIRK-HARTFIELD #852
Requested (queue) date
Proposed in-service date
Operational date2025-12-31
Withdrawn date
Developer
Utility / transmission ownerNational Grid

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.