National Grid DG 352205 is a 4.8 MW solar interconnection project in Onondaga, New York with a current status of operational. It is proposed to connect at JEWETT RD 291 / 36_11_29154.
4.8 MWCapacity
OperationalStatus
SkaneatelesMarket
SolarTechnology
Project facts
| Canonical name | National Grid DG 352205 |
|---|---|
| Queue ID | 352205 |
| Status | operational |
| Source status | Interconnected |
| Market | Skaneateles |
| Technology | Solar |
| Capacity | 4.8 MW |
| State | New York |
| County | Onondaga |
| Point of interconnection | JEWETT RD 291 / 36_11_29154 |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2025-12-19 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | National Grid |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-05 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-28
Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata