National Grid DG 371129 (371129)
National Grid DG 371129 is a 4.5 MW solar interconnection project in Herkimer, New York with a current status of operational. It is proposed to connect at W. HERKIMER 676 / 36_19_67651.
4.5 MWCapacity
OperationalStatus
MohawkMarket
SolarTechnology
Project facts
| Canonical name | National Grid DG 371129 |
|---|---|
| Queue ID | 371129 |
| Status | operational |
| Source status | Interconnected |
| Market | Mohawk |
| Technology | Solar |
| Capacity | 4.5 MW |
| State | New York |
| County | Herkimer |
| Point of interconnection | W. HERKIMER 676 / 36_19_67651 |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2025-07-30 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | National Grid |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-05 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27
Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata