National Grid DG 396406 (396406)

National Grid DG 396406 is a 2.0 MW solar interconnection project in Genesee, New York with a current status of operational. It is proposed to connect at NORTH LEROY / 36_04_0456.

2.0 MWCapacity
OperationalStatus
LeroyMarket
SolarTechnology

Project facts

Canonical nameNational Grid DG 396406
Queue ID396406
Statusoperational
Source statusInterconnected
MarketLeroy
TechnologySolar
Capacity2.0 MW
StateNew York
CountyGenesee
Point of interconnectionNORTH LEROY / 36_04_0456
Requested (queue) date
Proposed in-service date
Operational date2025-12-19
Withdrawn date
Developer
Utility / transmission ownerNational Grid

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata