National Grid DG 408022 (408022)

National Grid DG 408022 is a 2.3 MW solar interconnection project in Saratoga, New York with a current status of operational. It is proposed to connect at ELNORA 442 / 36_32_44256.

2.3 MWCapacity
OperationalStatus
Clifton ParkMarket
SolarTechnology

Project facts

Canonical nameNational Grid DG 408022
Queue ID408022
Statusoperational
Source statusInterconnected
MarketClifton Park
TechnologySolar
Capacity2.3 MW
StateNew York
CountySaratoga
Point of interconnectionELNORA 442 / 36_32_44256
Requested (queue) date
Proposed in-service date
Operational date2025-12-12
Withdrawn date
Developer
Utility / transmission ownerNational Grid

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.