National Grid DG 419633 (419633)

National Grid DG 419633 is a 5.0 MW solar interconnection project in Niagara, New York with a current status of operational. It is proposed to connect at LOCKPORT RD 216 / 36_03_21651.

5.0 MWCapacity
OperationalStatus
Niagara FallsMarket
SolarTechnology

Project facts

Canonical nameNational Grid DG 419633
Queue ID419633
Statusoperational
Source statusInterconnected
MarketNiagara Falls
TechnologySolar
Capacity5.0 MW
StateNew York
CountyNiagara
Point of interconnectionLOCKPORT RD 216 / 36_03_21651
Requested (queue) date
Proposed in-service date
Operational date2025-10-13
Withdrawn date
Developer
Utility / transmission ownerNational Grid

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.