National Grid DG 479210 is a 3.5 MW solar interconnection project in Saratoga, New York with a current status of operational. It is proposed to connect at ELNORA 442 / 36_32_44256.

3.5 MWCapacity
OperationalStatus
Burnt HillsMarket
SolarTechnology

Project facts

Canonical nameNational Grid DG 479210
Queue ID479210
Statusoperational
Source statusInterconnected
MarketBurnt Hills
TechnologySolar
Capacity3.5 MW
StateNew York
CountySaratoga
Point of interconnectionELNORA 442 / 36_32_44256
Requested (queue) date
Proposed in-service date
Operational date2025-12-08
Withdrawn date
Developer
Utility / transmission ownerNational Grid

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata