National Grid Storage 108583 (108583)

National Grid Storage 108583 is a 2.0 MW battery interconnection project in Oswego, New York with a current status of operational. It is proposed to connect at E. PULASKI 324 / 36_16_32451.

2.0 MWCapacity
OperationalStatus
PulaskiMarket
BatteryTechnology

Project facts

Canonical nameNational Grid Storage 108583
Queue ID108583
Statusoperational
Source statusInterconnected
MarketPulaski
TechnologyBattery
Capacity2.0 MW
StateNew York
CountyOswego
Point of interconnectionE. PULASKI 324 / 36_16_32451
Requested (queue) date
Proposed in-service date
Operational date2021-11-08
Withdrawn date
Developer
Utility / transmission ownerNational Grid

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata