National Grid Storage 109596 (109596)

National Grid Storage 109596 is a 6.3 MW battery interconnection project in Schenectady, New York with a current status of operational. It is proposed to connect at General Electric R&D to Inman Road 20.

6.3 MWCapacity
OperationalStatus
NiskayunaMarket
BatteryTechnology

Project facts

Canonical nameNational Grid Storage 109596
Queue ID109596
Statusoperational
Source statusInterconnected
MarketNiskayuna
TechnologyBattery
Capacity6.3 MW
StateNew York
CountySchenectady
Point of interconnectionGeneral Electric R&D to Inman Road 20
Requested (queue) date
Proposed in-service date
Operational date2018-07-19
Withdrawn date
Developer
Utility / transmission ownerNational Grid

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-28

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata