National Grid Storage 170284 (170284)

National Grid Storage 170284 is a 3.5 MW battery interconnection project in Fulton, New York with a current status of operational. It is proposed to connect at STONER 358 / 36_35_35853.

3.5 MWCapacity
OperationalStatus
JohnstownMarket
BatteryTechnology

Project facts

Canonical nameNational Grid Storage 170284
Queue ID170284
Statusoperational
Source statusInterconnected
MarketJohnstown
TechnologyBattery
Capacity3.5 MW
StateNew York
CountyFulton
Point of interconnectionSTONER 358 / 36_35_35853
Requested (queue) date
Proposed in-service date
Operational date2020-10-21
Withdrawn date
Developer
Utility / transmission ownerNational Grid

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-28

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata