National Grid Storage 218596 (218596)

National Grid Storage 218596 is a 3.2 MW battery interconnection project in Oswego, New York with a current status of operational. It is proposed to connect at WHITAKER 296 / 36_14_29652.

3.2 MWCapacity
OperationalStatus
FultonMarket
BatteryTechnology

Project facts

Canonical nameNational Grid Storage 218596
Queue ID218596
Statusoperational
Source statusInterconnected
MarketFulton
TechnologyBattery
Capacity3.2 MW
StateNew York
CountyOswego
Point of interconnectionWHITAKER 296 / 36_14_29652
Requested (queue) date
Proposed in-service date
Operational date2021-02-12
Withdrawn date
Developer
Utility / transmission ownerNational Grid

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata