National Grid Storage 218596 (218596)
National Grid Storage 218596 is a 3.2 MW battery interconnection project in Oswego, New York with a current status of operational. It is proposed to connect at WHITAKER 296 / 36_14_29652.
3.2 MWCapacity
OperationalStatus
FultonMarket
BatteryTechnology
Project facts
| Canonical name | National Grid Storage 218596 |
|---|---|
| Queue ID | 218596 |
| Status | operational |
| Source status | Interconnected |
| Market | Fulton |
| Technology | Battery |
| Capacity | 3.2 MW |
| State | New York |
| County | Oswego |
| Point of interconnection | WHITAKER 296 / 36_14_29652 |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2021-02-12 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | National Grid |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-05 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27
Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata