National Grid Storage 242287 (242287)

National Grid Storage 242287 is a 5.0 MW battery interconnection project in Onondaga, New York with a current status of operational. It is proposed to connect at PINE GROVE 59 / 36_11_5952.

5.0 MWCapacity
OperationalStatus
East SyracuseMarket
BatteryTechnology

Project facts

Canonical nameNational Grid Storage 242287
Queue ID242287
Statusoperational
Source statusInterconnected
MarketEast Syracuse
TechnologyBattery
Capacity5.0 MW
StateNew York
CountyOnondaga
Point of interconnectionPINE GROVE 59 / 36_11_5952
Requested (queue) date
Proposed in-service date
Operational date2022-03-04
Withdrawn date
Developer
Utility / transmission ownerNational Grid

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.