ND Queue Project MPC02600 — Wind in McLean, North Dakota

ND Queue Project MPC02600 — Wind in McLean, North Dakota is a 400.0 MW wind interconnection project in McLean, North Dakota with a current status of withdrawn. It is proposed to connect at Center - Red River Valley 345 kV Line.

400.0 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology

Project facts

Canonical nameND Queue Project MPC02600 — Wind in McLean, North Dakota
Queue IDMPC02600
Statuswithdrawn
Source status—
MarketND
TechnologyWind
Capacity400.0 MW
StateNorth Dakota
CountyMcLean
Point of interconnectionCenter - Red River Valley 345 kV Line
Requested (queue) date2012-12-10
Proposed in-service date2016-01-07
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerMinnkota Power Cooperative

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-11

Provenance: minnkota-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata