ND Queue Project MPC02900 — Wind in Barnes, North Dakota
ND Queue Project MPC02900 — Wind in Barnes, North Dakota is a 150.0 MW wind interconnection project in Barnes, North Dakota with a current status of withdrawn. It is proposed to connect at Jamestown - Buffalo 345 kV Line.
150.0 MWCapacity
WithdrawnStatus
NDMarket
WindTechnology
Project facts
| Canonical name | ND Queue Project MPC02900 — Wind in Barnes, North Dakota |
|---|---|
| Queue ID | MPC02900 |
| Status | withdrawn |
| Source status | — |
| Market | ND |
| Technology | Wind |
| Capacity | 150.0 MW |
| State | North Dakota |
| County | Barnes |
| Point of interconnection | Jamestown - Buffalo 345 kV Line |
| Requested (queue) date | 2016-07-21 |
| Proposed in-service date | 2018-12-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Minnkota Power Cooperative |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: minnkota-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata